News Search

News

Kuter Boulevard construction starts April 21st

  • Published
  • By 718th Civil Engineer Squadron
Road construction on Kuter Boulevard in front of the Banyan Tree Club is scheduled April 21st to May 22nd from 8 a.m. to 6 p.m.  Road cuts across the entire width of road will reduce traffic flow on Kuter Boulevard to a single lane each way at the site.  Please use extra caution when traveling down this stretch of the road.