AFSO 21 saves Kadena millions in parts, energy bills

Senior Airman Derek Hunter, 18th Civil Engineer Squadron Heating, Ventilation, Air Conditioning and Refrigeration technician, thumbs through the remote control to a heating ventilation and cooling system April 21. In the past, Kadena’s HVAC/R shop has had to replace large, outdoor, energy-wasting chiller units for buildings’ AC systems on military installations across the island nearly every three years. Now, Kadena recently instituted an initiative through the Air Force Smart Operations for the 21st Century program to replace the antiquated, over-oxidizing equipment with protected, indoor chillers to save the Air Force money. (U.S. Air Force photo/Staff Sgt. Jonathan Steffen)

PHOTO BY:
VIRIN: 110421-F-UI176-039.JPG
FULL SIZE: 1.92 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.